The Buckingham Cast Iron Bathtub has an integrated skirt that continues its oval silhouette to the floor. In a renovation, this makes the edge of the finished floor and the installer’s access part of the early planning.
Draw the skirt where it will meet the floor
Use the exact model drawing to mark the footprint and the adjoining wall, trim or tile transition. Check the space at each end and the route into the room. A tub can fit the plan once installed while still being difficult to bring through a doorway or turn in a hall. Give the handling team the exact dimensions and weight for the selected configuration.
Plan when the installer can reach the fittings
Ask the installer to walk through the fitting sequence before the last floor or wall finishes go in. Discuss floor support, the waste connection and how the bath will be positioned and serviced. If you want a filler close to the skirt, compare the fittings and the tub on the same drawing to check where the mounting point can go.
Send your room plan and chosen faucet reference to Cheviot Sales if you need help selecting product details before the installation team finalizes the layout.